Wind Park Intuponys, Prienai District, Lithuania

  • Bygningstype:
  • Energikonstruksjon
Full skjerm Avslutt

The two wind turbines built in the Prienai District are exclusive because of generating up to 3 MW of electricity. The power plants were brought from Germany, where they were used for 5 years. Peikko's anchor bolts were chosen as reliable and high quality products for the foundation structure of the plant.

Prosjektinformasjon

Entreprenør:
UAB Projektana
Levert, år:
2013
Ferdigstilt, år:
2014
Antall turbiner:
2
Turbinprodusent:
Furlander
Turbinstørrelse, MW:
3

Kontakt oss

Saulius Grigas

Saulius Grigas

Pardavimų grupės vadovas

Plieninės konstrukcijos, DELTABEAM sijos

Mob. +370 614 40120
[email protected]