Welti Furrer AG, Dielsdorf, Switzerland

  • Bygningstype:
  • Industribygg
  • Lager
  • Kontor
Full skjerm Avslutt

Warehouse and logistics building without obstructing columns

This storage and logistics building offers office and administrative space and includes

  • 6150 m² of art storage according with highest safety standards,
  • an underground car park with 77 parking spaces,
  • a fully automated container warehouse for 396 containers,
  • 2200 m² warehouse for pallets with a room height of 8 m, as well as
  • an intricate safety concept.

Due to the spacious layout of this building, it was particularly important to have as few columns as possible. Peikko's DELTABEAM® Frame composite structure with its high load-bearing composite columns and wide-span composite beams scored particularly well in this respect. In addition, all DELTABEAM® components are BIM ready for the 3D design methods used by METHABAU.

The combination of DELTABEAM® composite beams and composite columns saves considerable time and effort during assembly.  For a general contractor like METHABAU, this is one of the most important features of a modular structure. The project had unique challenges that were all solved in the design and construction process.

Les mer down-arrow.png

Prosjektinformasjon

Prosjektstørrelse:
8,350 m2
Utvikler:
Methabau
Entreprenør:
Methabau
Arkitekt:
Methabau
Prefab produsent:
BFU
Levert, år:
2017
Ferdigstilt, år:
2018

Kontakt oss

Sascha Schaaf

Sascha Schaaf

Leitung Projektentwicklung

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]