RHKW waste burning plant, Linz-Mitte, Austria

  • Bygningstype:
  • Energikonstruksjon
Full skjerm Avslutt

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Prosjektinformasjon

Utvikler:
LINZ AG
Entreprenør:
Bilfinger Berger BauGmbH, Linz
RIB:
BHM Ingenieure, Linz
Prefab produsent:
HABAU Hoch- und Tiefbau, Perg
Levert, år:
2010
Ferdigstilt, år:
2011