For the new Main Station in Vienna, we could deliver a support system for the power poles. The Main support part was delivered HDG and was connected with bended Anchor Bolts in the concrete part of the bridge.
Prosjektinformasjon
Utvikler:
ÖBB Infrastruktur, Wien
Entreprenør:
Bilfinger Berger Bau, Wien I+R Bau GmbH, Lauterach