Green Day Office Complex, Wrocław, Poland

  • Bygningstype:
  • Kontor
Full skjerm Avslutt Street View

The modern office building was built with the use of many ecological solutions and is classified in the LEED certification at the gold level.

More than 1,200 meters of DELTABEAM® Composite Beams based on PCs® hidden corbels were used in the buildings. Additionally, Peikko column connectors and MODIX® rebar couplers were used.

Prosjektinformasjon

Prosjektstørrelse:
30,000 m2
Etasjer:
7
Utvikler:
Skanska Property Poland
Entreprenør:
Skanska SA
RIB:
GP Konstruktor
Arkitekt:
Maćków Pracownia Projektowa
Prefab produsent:
Consolis
Levert, år:
2012
Ferdigstilt, år:
2014

Kontakt oss